Get a quote

Cirencester · Tetbury · Fairford · South Cerney · Lechlade · Malmesbury

Installation

Quality equipment, fitted properly.

A well-chosen system only performs if it’s installed with care. This is what goes into every installation we carry out.

Equipment

Proven systems. No false economies.

We prefer proven residential systems from manufacturers such as Samsung, LG and Daikin. We don’t fit the cheapest equipment available, because poor reliability, noisy operation and weak aftercare aren’t worth the small saving.

  • Samsung
  • LG
  • Daikin

Anatomy of an install

The standard back-to-back.

Most straightforward installations place the indoor unit on an external wall, with the outdoor unit close behind it on the other side. It keeps pipe runs short, neat and efficient.

Diagram of a back-to-back style installation The indoor unit is mounted high on the inside face of an external wall. Pipework, cable and the condensate drain pass through a single hole in the wall and run in trunking down the outside to the outdoor unit, which needs clear space around it for airflow and service access. A standard installation includes up to five metres of pipework and trunking. Inside Outside 1 2 3 4 5 Standard package: up to 5m of pipework/trunking between the units.
  1. 1

    Indoor unit high on the inside face of an external wall, with room for airflow.

  2. 2

    One neat core hole carries refrigerant pipes, cable and the condensate drain.

  3. 3

    Trunking keeps pipework tidy down the outside wall — up to 5m is included.

  4. 4

    Outdoor unit with suitable clearance for airflow and service access.

  5. 5

    Suitable electrical supply from your consumer unit — we’ll check this from your photos.

Our standards

Details you’ll notice.

  • 01 Pressure tested
  • 02 Evacuated
  • 03 Commissioned
  • 04 Handed over

Every system is commissioned by an F-Gas certified engineer.

See installations we’ve completed
  1. Neat pipework

    Pipework, insulation, cable, trunking and condensate routes are planned before anything is drilled, so the finished installation looks tidy and performs well.

  2. Correct clearances

    Indoor and outdoor units need suitable airflow and service access. If a proposed location isn’t suitable, we’ll say so and advise on a better one.

  3. Commissioned correctly

    Systems are pressure tested, evacuated, commissioned and handed over properly by an F-Gas certified engineer.

Before we quote

What can affect your installation.

Most homes suit a standard installation. These are the things we check from your details and photos.

See guide pricing
  • Pipe run length

    Up to 5m of pipework/trunking is included in the standard package; longer runs are charged per metre.

  • Condensate route

    Where the drain can’t fall naturally, a condensate pump may be needed — quoted individually.

  • Electrical supply

    Every installation needs a suitable supply. Long electrical runs are quoted after review.

  • Access & height

    First-floor work, awkward access or scaffolding are reviewed and quoted individually.

Start an enquiry

Tell us about the room.

A few details and photographs are usually enough for us to confirm whether your preferred locations will work and send a quotation — often without a site visit.

Call Get a quote